07/10/2026
Missed the SpeedLock308 launch? Here's the catch-up.
One question shaped the whole design: how much of a floodlight installation can be finished before the ladder even comes off the van?
Quite a lot, as it turns out. Developed in collaboration with WISKA UK Ltd and designed around the COMBI 308, SpeedLock308 lets the fitting be mounted and prepared at ground level, with the load carried by a fixing through the base of the bracket straight into the wall.
One month in, here's what installers are getting:
β’ Build and prepare at ground level
β’ One ladder trip, in the right installation
β’ Fewer holes in the wall, each one pre-marked
β’ Packaging that doubles as a drilling template
β’ Tool-less Quick-Lock nuts
β’ Neater rear cable management
Not a complicated system to learn. Just a set of practical details built around the way the job actually gets done.
SpeedLock308. Now in stock.
See more here ποΈ https://shorturl.at/sdRgv