22/10/2026
The Studio!
Using the Kango, we break up the tiles before shovelling the broken pieces into the wheelbarrow and tipping them onto the back of the tipper, ready for disposal later.
These tiles certainly didn’t want to come up easily! It took us around two days of hard work to break through the flooring and get it all removed.
We then move over to **Maison Violette**, where we come across a pretty cool find along the way before getting back to work on the kitchen floor.
The Kango comes out again as we continue breaking up and removing the existing floor, getting the kitchen ready for the next stage when the floor can be levelled out.
Two different locations, plenty of demolition, and another step forward in transforming both **The Studio and Maison Violette**.